The four connections
- Water: a supply line from the well or the city main is joined to the home's inlet. The federal installation standard requires an accessible shutoff valve between the supply and the inlet, a pressure-reducing valve where supply pressure is above 80 psi, and protection from freezing where winters are cold. The system is then tested for leaks.
- Sewer or septic: the home's main drain is connected to the sewer or septic inlet on the lot. Drain lines under the floor need a steady downward slope and proper support, and they are leak-tested as well.
- Electricity: power reaches the home's panel from a meter. Where the meter sits depends on local rules and the power company. The home is built for a set amperage, and the service on the lot has to match it.
- Gas: natural gas or propane is piped to the home's gas inlet. The appliances must be set up for the type of gas supplied, and the piping is tested for leaks before use. An all-electric home skips this step.
All four are covered by the installation rules for new manufactured homes in 24 CFR Part 3285.
Connections between sections
A multi-section home has extra joins. Where plumbing, wiring, gas piping or ductwork runs in more than one section, crossover connections link them once the sections are together. This is part of setting the home, and the installer normally does it. A single-wide has no crossovers, which keeps its hookup simpler.
Who is allowed to do the work
The federal standard says only qualified personnel familiar with local requirements may make utility connections and run the tests. Beyond that, the answer changes by state and sometimes by county:
- In some states a licensed manufactured home installer may make most of the connections.
- In others a licensed electrician must do the electrical service, and a licensed plumber or gas fitter the rest.
- The utility company usually connects its own side and sets the meter, often only after a local inspection has passed.
Ask the county permit office and your state's manufactured housing agency before work starts. The standard itself recommends consulting the local authority and each utility before anything is connected.
What has to be on the land first
A hookup joins the home to a service that already reaches the lot. On raw land that can mean drilling a well, running a power line in, setting a propane tank and installing a septic system, which normally needs its own permit from the county health department. In a manufactured home community the services are usually waiting at the lot.
What the home itself comes with
The plumbing, wiring and ductwork are built in at the factory. Of the catalog homes that publish a feature list, 97 % list a water heater. Washers and dryers are hookups only. Air conditioning units are not in the feature lists, so central air is a separate line in the quote builder. How it works shows where hookups fall after delivery, and you can browse single-wide homes to compare plans.