Data as of 2026-11-27
Why relocation is possible
The federal building standard treats the chassis as part of the home. Under Subpart J of 24 CFR Part 3280, the chassis is the frame, the towing hitch, the running gear (axles, wheels, tires and brakes) and the road lights, and the home has to be designed to withstand highway travel and still work once it is set up.
The frame stays under the home for good. The hitch, axles and wheels are often taken off after installation, so they have to be refitted before the home can roll again.
Where it may go
Not every location will do. Three checks come first:
- The zones on the data plate. Each home is built for one wind zone, one roof load zone and one thermal zone. The federal installation standards say a home must not be installed in a zone beyond the one it was designed for, and the structure does not change when the home is relocated. A home built for Wind Zone I does not belong in a Zone II or III area.
- The rules of the new place. Zoning at the destination has to allow the home. A land-lease community may set its own limits on the age and condition of homes it accepts.
- State rules on second installations. The federal installation program covers the first installation of a new home and leaves later ones to the states (24 CFR Part 3286). Ask the state housing agency what applies.
What the job involves
- Paperwork. Many states and counties want a moving permit, and some ask for proof that taxes on the home are paid. This varies by state. If there is a loan on the home, the lender will normally have to agree first.
- Take-down. Utilities are disconnected. Skirting, steps, decks and anchors come off.
- Separation. A double-wide or triple-wide is split along the line where its sections meet, and the open sides are closed against the weather.
- Running gear. Axles, wheels and the hitch go back on.
- Transport. Each section travels as an oversize load with its own road permits and, where required, escort cars.
- Reinstallation. The home is set up again at the new site.
What has to be redone at the new site
Almost everything outside the walls. The ground is prepared and a new foundation is built. The home is leveled and anchored against wind. Sections are rejoined and sealed, and the roof, siding and interior seams along the joint are closed up. Water, sewer, power and gas are reconnected, then skirting and steps go back. Expect a new installation permit and inspection. The standards for this work are in 24 CFR Part 3285.
What it costs
We do not price relocations, but the delivery figures for new homes give a floor. The low-end estimates used by our quote builder are:
- First 60 miles: $700 for a single-section home, $2,000 for a double-wide, $3,000 for a triple-wide.
- Beyond 60 miles: $4 a mile for towing plus $1.50 a mile for an escort car, per section.
- Road permits: $50 per section per state.
- Set-up: $2,000 for a single-section home, $4,000 for a double-wide.
Relocating a lived-in home adds the take-down work, a new foundation and utility connections, none of which are in those figures. Get a written quote from the transporter and the installer.
Before you move an older home
A home built before June 15, 1976 was not built to the federal standard, and some places will not accept one. Financing can change too. The USDA guaranteed loan rules, for example, do not allow a loan to buy an existing home that has been moved from another site (7 CFR Part 3555).
If the numbers do not work, compare them with a new home delivered to the same ZIP code in the quote builder. You can start from the single-wide collection, and how it works explains a first delivery.







