Talk to a home expert(800) 555-0142
Question

Can a manufactured home be moved?

Yes. A manufactured home is built on a steel chassis so it can travel by road, and it can be relocated after it is first installed. The job needs a licensed transporter, road permits and a fresh installation at the other end. A multi-section home is taken apart and hauled one section at a time.

Data as of 2026-11-27

Why relocation is possible

The federal building standard treats the chassis as part of the home. Under Subpart J of 24 CFR Part 3280, the chassis is the frame, the towing hitch, the running gear (axles, wheels, tires and brakes) and the road lights, and the home has to be designed to withstand highway travel and still work once it is set up.

The frame stays under the home for good. The hitch, axles and wheels are often taken off after installation, so they have to be refitted before the home can roll again.

Where it may go

Not every location will do. Three checks come first:

  • The zones on the data plate. Each home is built for one wind zone, one roof load zone and one thermal zone. The federal installation standards say a home must not be installed in a zone beyond the one it was designed for, and the structure does not change when the home is relocated. A home built for Wind Zone I does not belong in a Zone II or III area.
  • The rules of the new place. Zoning at the destination has to allow the home. A land-lease community may set its own limits on the age and condition of homes it accepts.
  • State rules on second installations. The federal installation program covers the first installation of a new home and leaves later ones to the states (24 CFR Part 3286). Ask the state housing agency what applies.

What the job involves

  1. Paperwork. Many states and counties want a moving permit, and some ask for proof that taxes on the home are paid. This varies by state. If there is a loan on the home, the lender will normally have to agree first.
  2. Take-down. Utilities are disconnected. Skirting, steps, decks and anchors come off.
  3. Separation. A double-wide or triple-wide is split along the line where its sections meet, and the open sides are closed against the weather.
  4. Running gear. Axles, wheels and the hitch go back on.
  5. Transport. Each section travels as an oversize load with its own road permits and, where required, escort cars.
  6. Reinstallation. The home is set up again at the new site.

What has to be redone at the new site

Almost everything outside the walls. The ground is prepared and a new foundation is built. The home is leveled and anchored against wind. Sections are rejoined and sealed, and the roof, siding and interior seams along the joint are closed up. Water, sewer, power and gas are reconnected, then skirting and steps go back. Expect a new installation permit and inspection. The standards for this work are in 24 CFR Part 3285.

What it costs

We do not price relocations, but the delivery figures for new homes give a floor. The low-end estimates used by our quote builder are:

  • First 60 miles: $700 for a single-section home, $2,000 for a double-wide, $3,000 for a triple-wide.
  • Beyond 60 miles: $4 a mile for towing plus $1.50 a mile for an escort car, per section.
  • Road permits: $50 per section per state.
  • Set-up: $2,000 for a single-section home, $4,000 for a double-wide.

Relocating a lived-in home adds the take-down work, a new foundation and utility connections, none of which are in those figures. Get a written quote from the transporter and the installer.

Before you move an older home

A home built before June 15, 1976 was not built to the federal standard, and some places will not accept one. Financing can change too. The USDA guaranteed loan rules, for example, do not allow a loan to buy an existing home that has been moved from another site (7 CFR Part 3555).

If the numbers do not work, compare them with a new home delivered to the same ZIP code in the quote builder. You can start from the single-wide collection, and how it works explains a first delivery.

FLOOR PLANS

Homes to look at

Real floor plans from Lakin Homes, each with photos, a floor plan and its price on the home page.

Common questions

Can a double-wide be relocated?

Yes. The two halves are separated, each is hauled as its own load, and they are joined and sealed again at the new site. Costs for towing, escort cars and road permits apply to each section.

Do you need a permit to move a manufactured home?

Yes. Each section is an oversize load and needs road permits in every state on the route. Many counties also require a moving permit before the home leaves and an installation permit where it arrives. The exact list varies by state.

Can you move one yourself?

It is not a do-it-yourself job. It takes a truck made for the purpose, oversize-load permits and insurance, and states set who may transport and install homes. Hire a transporter and an installer licensed where you live.

Do the label and data plate stay with the home?

Yes. The metal label on each section and the data plate inside stay in place through a relocation. The installer at the new site needs the data plate to confirm the zones the home was built for.

FLOOR PLANS

More floor plans

Every home has its own page with photos, specifications and price.

Your next step

Compare the cost of a move with a new home delivered to your ZIP code in the quote builder.