The eight steps and who does each
The place comes before the home. The land or community lot decides how big the home can be, what foundation it needs and which wind, snow and climate ratings it must be built for. So settle the place first and pick the floor plan third.
| Step | What happens | Who does it |
|---|---|---|
| 1. Decide where it will go | Your own land, or a rented lot in a community | You |
| 2. Check zoning and design zones | Confirm the home is allowed on the lot and which wind, roof load and thermal zones apply | You and the county or city planning office; the seller confirms the home's zones |
| 3. Choose a size and floor plan | Pick the number of sections, bedrooms and layout that fit the lot | You |
| 4. Price it in full | Add delivery, installation, foundation and site costs to the home's price | You, from the seller's written quote |
| 5. Arrange payment or financing | Pay cash or apply for a loan | You and the lender |
| 6. Prepare the site | Permits, clearing, grading, foundation and utilities | You or your contractor, the installer and the local permit office |
| 7. Delivery and set-up | Each section is hauled in, placed, joined, anchored and connected | The transport company and a licensed installer |
| 8. Final checks | Inspection, walk-through and paperwork | The inspector, the installer and you |
Step 1: decide where the home will go
There are two choices, and each changes the rest of the purchase.
- Your own land. You need the legal right to place a home there, a route wide enough for an oversize load, room for the home plus the setbacks the county requires, and a way to get water, sewer or septic, and power. The site work and the permits are your responsibility.
- A manufactured home community. You own the home and rent the lot. The community has its own rules on the size, age and look of the homes it accepts, and often on skirting and steps. Ask for the rules and the lot dimensions in writing before you choose a home, and ask who arranges set-up.
The choice also affects how you can pay. A home on a rented lot is financed on its own, without land, which narrows the kinds of loan on offer.
Step 2: check zoning and the three design zones
Zoning is local. The county or city decides where a manufactured home may be placed, how far it must sit from the lot lines, what foundation it needs and which permits you must get. Call the planning or zoning office with the parcel number and ask three things: whether a manufactured home is allowed on this parcel, whether there are size or foundation conditions, and whether the parcel is in a mapped flood hazard area. Deed restrictions and homeowner association rules can also block a home, so read those too.
Then check the home against the place. Every manufactured home is built for:
- A wind zone: I, II or III. Zones II and III are the higher-wind zones along much of the Gulf and Atlantic coasts.
- A roof load zone: South, Middle or North, for the weight of snow the roof must carry.
- A thermal zone: 1, 2 or 3, which sets how much insulation the home needs.
The wind and roof load zones are set out in 24 CFR 3280.305 and the thermal zones in 24 CFR 3280.506. The federal installation standards say a home must not be installed in a wind, roof load or thermal zone beyond the one it was designed for. The zones are printed on the data plate inside the home. Ask the seller to confirm in writing that the home you order will be built for the zones at your address. Our page on the HUD Code explains the data plate and the labels.
Step 3: choose a size and floor plan
Size comes from the number of sections. In our catalog of 2,319 floor plans:
- Single-wide: 527 plans, from 391 to 1,368 square feet. One section, long and narrow. See single-wide homes.
- Double-wide: 1,196 plans, from 775 to 2,799 square feet. Two sections joined on site. See double-wide homes.
- Triple-wide: 47 plans, from 1,600 to 3,379 square feet. Three sections. See triple-wide homes.
Measure the buildable part of the lot first and compare it with the width and length shown on each home's page. After that, choose on bedrooms, bathrooms and how the rooms connect. In our catalog, 468 homes have an interactive 3D tour, which is the quickest way to judge a layout; they are gathered under homes with 3D tours. Furniture and décor in photos and tours are staging and are not part of the home.
If the zoning office says the lot needs a home built to the local building code, look at modular homes instead. Manufactured vs modular explains the difference.
Step 4: price it with delivery and installation
The price on a home's page is for the home as it leaves the factory. What you actually pay also includes:
- Delivery: priced by distance from the factory, the number of sections and the states crossed.
- Set-up and foundation: placing, leveling, joining and anchoring the home.
- Add-ons the home needs to be lived in: skirting, steps, and an air conditioning unit if you want one.
- Site costs: land, clearing, utility connections, permits and sales tax.
The quote builder adds delivery by ZIP code, installation and a payment estimate to any home. For a double-wide, the low-end estimates used by our quote builder are $2,000 for delivery within the first 60 miles, $4,000 for set-up and $2,000 for a pier foundation. These are estimates, not quotes, and they leave out land, site clearing, utility connections, permits, steps and decks, and sales tax. Before you commit, get a written quote that lists every one of those lines and says who is responsible for each.
Step 5: arrange payment or financing
How you pay depends largely on whether the home is financed together with land.
- Cash: the simplest route. You still need the full installed price, not just the home's.
- A home-only loan: used when the home is titled as personal property, for example on a rented lot. Its terms are usually different from a mortgage's, so compare offers in writing.
- A mortgage: possible when the home and the land are financed together as real estate. Lenders set conditions on the foundation and on how the home is titled.
- Government-backed loans: FHA insures loans for manufactured homes and lots under Title I (24 CFR Part 201), and VA home loans can be used for a manufactured home that meets the program's rules.
The lender decides approval, rate and term; nobody else can promise them. Talk to a lender before you prepare the site, because the loan may dictate the foundation. Our financing page describes the options in more detail.
Step 6: prepare the site
The site has to be ready before the home leaves the factory. That means:
- Permits. The county or city permit office tells you which ones you need. Fees and rules vary by state and county.
- Access and clearing. The truck needs a firm, wide path to the exact spot, clear of branches and low wires.
- Grading. Under the federal installation standards (24 CFR Part 3285), the ground must slope away from the home so that water does not collect under it.
- Foundation. Most homes sit on piers and footings with ground anchors; a slab or a perimeter wall is also possible. The soil is checked before the foundation is built.
- Utilities. Water, sewer or septic, power and gas are brought to the home's position, ready to connect.
Step 7: delivery and set-up
Each section travels on its own chassis as a separate wide load. At the site the installer places the sections on the foundation, levels them, joins them along the center line, anchors the home against wind and connects the plumbing, wiring and ducts that cross between sections. Utility hook-ups and finish work follow.
Installation is regulated. Where a state does not run its own program, HUD's applies: the installer must be licensed and must confirm in writing that the work meets the standards (24 CFR Part 3286). States with their own program set rules that protect buyers at least as well. Before you sign a sales contract, the retailer must give you a separate written notice about the installation requirements that apply. Ask your state's manufactured housing agency who inspects installations where you live.
Step 8: final checks before you move in
- Inspection. Many places require a local inspection or an occupancy approval before you move in. The permit office will tell you.
- Walk-through. Open every door and window, run every tap, flush every toilet, switch on each appliance and the heating, and look along the ceiling and floor where the sections meet. Note any damage from the trip.
- Labels and data plate. There should be a red label on the outside of each section and a data plate inside.
- Papers. Keep the consumer manual that the manufacturer must supply with the home, the installation instructions, the warranty documents and your title paperwork.
Put anything unfinished on a written list, with a name against each item. If a defect appears later and the manufacturer, retailer and installer disagree about who must fix it, a dispute resolution program exists for defects reported within one year of the first installation (24 CFR Part 3288).