Talk to a home expert(800) 555-0142
Guide

How to buy a manufactured home

The purchase takes eight steps: decide where the home will go, check zoning and the home's design zones, choose a size and floor plan, price it with delivery and installation, arrange payment, prepare the site, take delivery and set-up, then do the final checks. The order matters, because the place decides which homes you can buy.

Data as of 2026-11-27

The eight steps and who does each

The place comes before the home. The land or community lot decides how big the home can be, what foundation it needs and which wind, snow and climate ratings it must be built for. So settle the place first and pick the floor plan third.

StepWhat happensWho does it
1. Decide where it will goYour own land, or a rented lot in a communityYou
2. Check zoning and design zonesConfirm the home is allowed on the lot and which wind, roof load and thermal zones applyYou and the county or city planning office; the seller confirms the home's zones
3. Choose a size and floor planPick the number of sections, bedrooms and layout that fit the lotYou
4. Price it in fullAdd delivery, installation, foundation and site costs to the home's priceYou, from the seller's written quote
5. Arrange payment or financingPay cash or apply for a loanYou and the lender
6. Prepare the sitePermits, clearing, grading, foundation and utilitiesYou or your contractor, the installer and the local permit office
7. Delivery and set-upEach section is hauled in, placed, joined, anchored and connectedThe transport company and a licensed installer
8. Final checksInspection, walk-through and paperworkThe inspector, the installer and you

Step 1: decide where the home will go

There are two choices, and each changes the rest of the purchase.

  • Your own land. You need the legal right to place a home there, a route wide enough for an oversize load, room for the home plus the setbacks the county requires, and a way to get water, sewer or septic, and power. The site work and the permits are your responsibility.
  • A manufactured home community. You own the home and rent the lot. The community has its own rules on the size, age and look of the homes it accepts, and often on skirting and steps. Ask for the rules and the lot dimensions in writing before you choose a home, and ask who arranges set-up.

The choice also affects how you can pay. A home on a rented lot is financed on its own, without land, which narrows the kinds of loan on offer.

Step 2: check zoning and the three design zones

Zoning is local. The county or city decides where a manufactured home may be placed, how far it must sit from the lot lines, what foundation it needs and which permits you must get. Call the planning or zoning office with the parcel number and ask three things: whether a manufactured home is allowed on this parcel, whether there are size or foundation conditions, and whether the parcel is in a mapped flood hazard area. Deed restrictions and homeowner association rules can also block a home, so read those too.

Then check the home against the place. Every manufactured home is built for:

  • A wind zone: I, II or III. Zones II and III are the higher-wind zones along much of the Gulf and Atlantic coasts.
  • A roof load zone: South, Middle or North, for the weight of snow the roof must carry.
  • A thermal zone: 1, 2 or 3, which sets how much insulation the home needs.

The wind and roof load zones are set out in 24 CFR 3280.305 and the thermal zones in 24 CFR 3280.506. The federal installation standards say a home must not be installed in a wind, roof load or thermal zone beyond the one it was designed for. The zones are printed on the data plate inside the home. Ask the seller to confirm in writing that the home you order will be built for the zones at your address. Our page on the HUD Code explains the data plate and the labels.

Step 3: choose a size and floor plan

Size comes from the number of sections. In our catalog of 2,319 floor plans:

  • Single-wide: 527 plans, from 391 to 1,368 square feet. One section, long and narrow. See single-wide homes.
  • Double-wide: 1,196 plans, from 775 to 2,799 square feet. Two sections joined on site. See double-wide homes.
  • Triple-wide: 47 plans, from 1,600 to 3,379 square feet. Three sections. See triple-wide homes.

Measure the buildable part of the lot first and compare it with the width and length shown on each home's page. After that, choose on bedrooms, bathrooms and how the rooms connect. In our catalog, 468 homes have an interactive 3D tour, which is the quickest way to judge a layout; they are gathered under homes with 3D tours. Furniture and décor in photos and tours are staging and are not part of the home.

If the zoning office says the lot needs a home built to the local building code, look at modular homes instead. Manufactured vs modular explains the difference.

Step 4: price it with delivery and installation

The price on a home's page is for the home as it leaves the factory. What you actually pay also includes:

  • Delivery: priced by distance from the factory, the number of sections and the states crossed.
  • Set-up and foundation: placing, leveling, joining and anchoring the home.
  • Add-ons the home needs to be lived in: skirting, steps, and an air conditioning unit if you want one.
  • Site costs: land, clearing, utility connections, permits and sales tax.

The quote builder adds delivery by ZIP code, installation and a payment estimate to any home. For a double-wide, the low-end estimates used by our quote builder are $2,000 for delivery within the first 60 miles, $4,000 for set-up and $2,000 for a pier foundation. These are estimates, not quotes, and they leave out land, site clearing, utility connections, permits, steps and decks, and sales tax. Before you commit, get a written quote that lists every one of those lines and says who is responsible for each.

Step 5: arrange payment or financing

How you pay depends largely on whether the home is financed together with land.

  • Cash: the simplest route. You still need the full installed price, not just the home's.
  • A home-only loan: used when the home is titled as personal property, for example on a rented lot. Its terms are usually different from a mortgage's, so compare offers in writing.
  • A mortgage: possible when the home and the land are financed together as real estate. Lenders set conditions on the foundation and on how the home is titled.
  • Government-backed loans: FHA insures loans for manufactured homes and lots under Title I (24 CFR Part 201), and VA home loans can be used for a manufactured home that meets the program's rules.

The lender decides approval, rate and term; nobody else can promise them. Talk to a lender before you prepare the site, because the loan may dictate the foundation. Our financing page describes the options in more detail.

Step 6: prepare the site

The site has to be ready before the home leaves the factory. That means:

  1. Permits. The county or city permit office tells you which ones you need. Fees and rules vary by state and county.
  2. Access and clearing. The truck needs a firm, wide path to the exact spot, clear of branches and low wires.
  3. Grading. Under the federal installation standards (24 CFR Part 3285), the ground must slope away from the home so that water does not collect under it.
  4. Foundation. Most homes sit on piers and footings with ground anchors; a slab or a perimeter wall is also possible. The soil is checked before the foundation is built.
  5. Utilities. Water, sewer or septic, power and gas are brought to the home's position, ready to connect.

Step 7: delivery and set-up

Each section travels on its own chassis as a separate wide load. At the site the installer places the sections on the foundation, levels them, joins them along the center line, anchors the home against wind and connects the plumbing, wiring and ducts that cross between sections. Utility hook-ups and finish work follow.

Installation is regulated. Where a state does not run its own program, HUD's applies: the installer must be licensed and must confirm in writing that the work meets the standards (24 CFR Part 3286). States with their own program set rules that protect buyers at least as well. Before you sign a sales contract, the retailer must give you a separate written notice about the installation requirements that apply. Ask your state's manufactured housing agency who inspects installations where you live.

Step 8: final checks before you move in

  • Inspection. Many places require a local inspection or an occupancy approval before you move in. The permit office will tell you.
  • Walk-through. Open every door and window, run every tap, flush every toilet, switch on each appliance and the heating, and look along the ceiling and floor where the sections meet. Note any damage from the trip.
  • Labels and data plate. There should be a red label on the outside of each section and a data plate inside.
  • Papers. Keep the consumer manual that the manufacturer must supply with the home, the installation instructions, the warranty documents and your title paperwork.

Put anything unfinished on a written list, with a name against each item. If a defect appears later and the manufacturer, retailer and installer disagree about who must fix it, a dispute resolution program exists for defects reported within one year of the first installation (24 CFR Part 3288).

FLOOR PLANS

Homes to look at

Real floor plans from Lakin Homes, each with photos, a floor plan and its price on the home page.

Common questions

Do I need land before I choose a home?

It is the safest order. The lot sets the maximum width and length, the foundation, and the wind, roof load and thermal zones the home must be built for. You can browse floor plans at any time, but confirm the place before you order.

Can I put a manufactured home on any piece of land?

No. Local zoning decides where one may be placed, and deed restrictions or community rules can add limits. Ask the county or city planning office about the exact parcel before you buy the land or the home.

Is the price on a home's page the full cost?

No. It is the price of the home as built at the factory. Delivery, set-up, the foundation, skirting, steps, utility connections, permits, sales tax and the land are extra. The quote builder estimates delivery and installation for your ZIP code.

Who installs the home?

An installer who follows the manufacturer's installation instructions and the installation rules for your state. In states where HUD runs the installation program the installer must hold a HUD license; other states set their own requirements.

Can I get a mortgage on a manufactured home?

Sometimes. A lender may offer one when the home and the land are financed together as real estate and the home meets the lender's foundation and title conditions. Otherwise a home-only loan is the usual route. Only the lender can say what you qualify for.

FLOOR PLANS

More floor plans

Every home has its own page with photos, specifications and price.

Your next step

Browse the floor plans, then add delivery and installation for your ZIP code in the quote builder.